Creating the Program Schedule

The schedule defines the order and timing for each campaign to be displayed.
What it does
- organizes the sequence of campaigns;
- defines default campaigns;
- allows synchronization scheduling;
- controls when the content goes live.
Next step
- Create or choose the campaign that will be used.
- Open the schedule area.
- Define the schedule name.
- Choose the default campaign.
- Save the configuration.
After that
You can synchronize the terminals to apply the changes.